Lake Michigan Shoreline Erosion Control Project in Antrim County
Antrim County, MI

Grantee: Antrim Conservation District
Basin Program Funds: $15,000
Non-federal Funds: $18,050
Project Duration: 06/1996 - 06/1997
Status: complete

Problem Statement
In a November 1995 inventory conducted by the Antrim Conservation District and the Antrim County Road Commission, eight road/stream crossings were determined to be delivering excessive amounts of sediment to streams and/or wetlands in the area.

Image 1: Click to see full size

Background
The goal of this project was to implement the portion of the Elk River Chain of Lakes Watershed Management Plan, a product of the Elk River Chain of Lakes Steering Committee, that addresses water resource quality improvements within the watershed. Part of the plan's implementation strategy is to improve priority road/stream crossings. For this project, three severely eroded crossings in the Elk River and Grand Traverse Bay watersheds were chosen as demonstration sites: the Antrim Creek Natural Area, the Cedar River road/stream crossing, and the VanStratten Creek road/stream crossing. Sedimentation problems at all three sites result from the continuous flow of water from seeps and springs down steep dirt roads.

Activities
VanStratten Creek: It is estimated that 80 tons of sediment go into this creek each year. To control this problem, a series of retention basins were installed, in conjunction with two french drains, to control a side hill seep. In addition, culvert extensions were banded to create more slope. To stabilize this critically eroding area further, rock rip-rap was placed over geo-textile fabric and the bank was seeded and mulched.

Cedar Creek: The Cedar Creek road/stream crossing was a priority site due to the steepness of the road above the stream crossing and culvert. Paving the Cedar Creek road/stream crossing prevented over 100 tons of sediment from entering the creek.

Antrim Creek: Antrim Creek was a high priority site for restoration because of its designation as a Natural Area and its closeness to Grand Traverse Bay. An estimated 125 tons of sediments was being washed down a road that crosses a steep bluff. Spring seeps helped contribute to the problem. Through earthwork improvements, the installation of tile and geo-textile wrapped filter beds, as well as re-seeding and mulching work, the soil erosion and sedimentation problems have been controlled.

Image 2: Click to see full size

Results
To promote the success of this project, the Antrim Conservation District, in cooperation with the Antrim Road Commission, sponsored a tour of the improved sites.

Annually a total of 241 tons of soil, 24 pounds of phosphorus, and 16 pounds of nitrogen have been saved as a result of this project. The number and type of audiences reached through this project include 125 residents, six township supervisors, and the personnel at three road commissions.

 